The MCBs ought to be clipped onto the Din bar and also the busbar into a recent flowing terminal and limited screwed to provide current towards the MCBs.Two 16/25mm tail cables, 1 neutral and the other Energetic are connected to the leading double pole switch from the meter. The primary earth cable need to be screwed into the earth block, and The e